Progress tracking directly connected to the field

Thanks to Augmented Reality, NEXT-BIM allows managing site progress directly from the 3D model.

Each BIM object can be linked to:

  • a progress phase
  • a custom status
  • a due date
  • measurement indicators

Tracking relies on business logic adapted to each project. The progress rate is automatically calculated based on BIM object properties, such as: Length, Diameter, Volume, Weight…

This ensures reliable indicators, objective measurements and direct linkage to actually installed quantities.

In Viewer mode or Augmented Reality, relevant objects are automatically highlighted in the model to facilitate identification. The user directly selects elements by highlighting them and instantly updates their status.

With NEXT-BIM, progress tracking no longer relies on 2D drawings. The model becomes a control tool. The site is monitored using measurable data, shared and directly linked to actually installed objects.

Reliable technology, compatible with your tools

  • Unique alignment technology
  • Supported formats: IFC, NWD
  • Devices: iPad Pro, HoloLens 2
  • Offline mode
  • openBIM compatible
  • No data stored in the cloud
Request a demo

FAQ

Can progress phases and statuses be customized?

Yes, each project can define its own phases and statuses (e.g. installation, insulation, finishing). Phasing is fully customizable in the NEXT-BIM Configurator.

Is the calculation of the progress percentage automatic?

Yes, NEXT-BIM calculates the % progress based on quantities or the number of validated objects per phase or per zone. It is possible to define your own calculation depending on object types.

Can progress be tracked without being on site?

Yes, tracking can be performed from the tablet viewer or PC, with later synchronization of modifications made on site.

What export formats are available?

Word, Excel and BCF, to ensure compatibility with project management tools and BIM collaborative platforms.