Digital as-built

Accelerate your as-built. Improve quality. Reduce rework.

With the NEXT-BIM Augmented Reality solution, compare the 3D model with reality, detect deviations instantly at any moment, and generate your as-built deliverables in just a few clicks.

Why perform a digital as-built in Augmented Reality?

With NEXT-BIM, Augmented Reality transforms the as-built process into a continuous control workflow, directly on site.

The BIM model is superimposed onto reality at 1:1 scale, making it possible to verify compliance between design and execution in real time.

Each built element — equipment, networks, etc. — is visually compared with the BIM model. Areas that are usually invisible (under slabs, false ceilings, technical openings) remain precisely locatable without interpreting drawings.

Deviations are immediately visible, measurable and documented: comments, photos and measurements are directly linked to the model and automatically integrated into reports (Word, Excel, BCF).

This results in a reliable and verifiable as-built documentation, produced without re-entry, with significant time savings, enhanced legal traceability, and objective proof of compliance.

With NEXT-BIM, contractors and project owners anticipate non-conformities, secure deliverables, and strengthen transparency and collaboration on site.

Augmented Reality VS 3D scan or 360° camera

Why is it complementary?

3D scans and 360° cameras are useful for capturing a site status at a given time for archiving or visual proof. However, they require post-processing to compare the 3D model with the construction site, which delays analysis and decision-making.

What Augmented Reality changes with NEXT-BIM

  • Immediate model vs reality comparison, directly on site
  • Deviations visible instantly, without post-processing
  • Annotations and measurements integrated into the model, exportable in one click
  • Decisions made directly on site with all stakeholders

The NEXT-BIM Augmented Reality solution fits during execution, where quality, schedule and costs are determined.

How does it work?

Execution inspection workflow with NEXT-BIM

NEXT-BIM enables smooth inspection in Augmented Reality without complex preparation. Here are the key steps of the process:

  1. Step 1 – Superimpose the 3D model onto reality

    NEXT-BIM technology automatically aligns the 3D model with the real environment, without markers or manual calibration. Alignment is continuous. The superposition remains reliable and precise throughout the visit, even while moving on site.

  2. Step 2 – Compare design vs execution

    The user visually compares the model with reality at 1:1 scale. Differences in openings, equipment, networks, clearances or heights become immediately visible, without interpreting drawings.

  3. Step 3 – Annotate and measure on site

    When a deviation is detected, an annotation is immediately created on site. Deviations are documented and georeferenced directly in the 3D model. Annotations include photos, comments, statuses and precise measurements of differences between the model and reality.

  4. Step 4 – Generate and share reports

    Annotations are automatically exported into reports (BCF, Word, Excel). Deliverables are ready to be shared.

Reliable technology, compatible with your tools

  • Unique alignment technology
  • Supported formats: IFC, NWD
  • Devices: iPad Pro, HoloLens 2
  • Offline mode
  • openBIM compatible
  • No data stored in the cloud
Request a demo

Tools designed to act directly on site

The as-built process with NEXT-BIM is not limited to visualizing the model in Augmented Reality. It makes it possible to identify, qualify and track deviations directly on site, thanks to tools designed for field control and traceability.

Cyril Thillaye Du Boullay— HRS Real Estate

The BIM model no longer stays on a screen. It is directly superimposed onto reality on site. In practice, we use NEXT-BIM to:

  1. Verification during construction:

    • Compliance of openings,
    • Compliance of openings,
    • Positioning of supports…

    We detect deviations early and correct them before they block the project.

  2. Preparation of the as-built:

    • The model is compared with reality
    • We verify that execution matches the design
    • We identify deviations
    • We communicate and correct before handover thanks to #BCF and #IFC

Result: fewer surprises at the end of the project, fewer late corrections, and above all, a more reliable as-built.

FAQ

Can deviations be filtered by trade or company?

Yes, each annotation can be categorized and sorted in the report.

Does it work on technical networks?

Yes, this is one of the most common use cases (HVAC, plumbing, electrical).