Concrete impacts, measurable results
- 50%
reduction in rework costs. Clashes and design errors are detected earlier, before they become costly and impact the project schedule.
- 50%
gain in inter-team coordination. A shared BIM model visualized as an overlay on site eliminates misunderstandings and reduces back-and-forth between design office and site.
- 90%
gain in inspection time. Defects, deviations and missing elements are immediately visible on site. Example: Up to 1500 m² per hour for reservation inspections.
Discover our solution in video!
The video loads from YouTube when you click.
Benefits for your different teams

Management / activity managers
- Reduction of risks related to cost and schedule deviations.
- Better secured margins on projects.
- Reliable and innovative company image for clients.

Project managers / Site engineers
- An objective tool to quickly arbitrate technical deviations.
- Better coordination between trades.
- Improved quality & time savings in inspections.

Site managers / field teams
- Immediate understanding of the BIM model.
- Fewer back-and-forth between design office ↔ site.
- Greater confidence in execution quality.

With NEXT-BIM, the boundary between fiction and reality on construction sites is about to disappear. The use of NEXT-BIM on the TO LYON project allowed architects and contractors to share their data under real construction conditions and compare them with the initial designs and design changes. In addition to controlling execution quality during the EXE phase across all technical trades (HVAC, Plumbing, Architecture, Structure, Electrical), this helps verify the models.
Your 3 main priorities, our promise
Drastically reduce rework
Detect differences between model and reality much earlier: network clashes, missing openings, non-compliant heights, maintenance accessibility issues… Less rework = fewer hidden costs, fewer tensions with clients and subcontractors.
Meet (or even gain) time on schedules
By avoiding last-minute blockages and endless inspections, your teams maintain control of the schedule. Decisions are made based on visual proof, not on drawings interpreted differently.
Better manage your resources
At any time, you know exactly where the site stands for each zone, trade or system. You mobilize your teams and subcontractors where the schedule impact is greatest.
Concrete use cases, proven in the field
Equipment adapted to your needs
NEXT-BIM iPad Pro
Simple and accessible solution on site for BIM.
Visualize the BIM model at full scale directly on site. Without Internet, without complex configuration. AR accessible to all field teams. You keep the model in your pocket, ready to be displayed in Augmented Reality (AR) on site.
Discover: NEXT-BIM iPad Pro
NEXT-BIM HoloLens 2
Immersive and collaborative solution for BIM.
Full immersion to understand, control, install and decide on site. A hands-free, immersive and ultra-precise experience for your projects. Leverage the full potential of your BIM models thanks to the NEXT-BIM version for HoloLens 2, the tool for demanding projects.
Discover: NEXT-BIM HoloLens 2
Discover customer cases

Kantonsspital Aarau: How Digital Continuity Connects Construction, As-Built BIM and Maintenance
At Kantonsspital Aarau, general contractor Implenia used NEXT-BIM for construction monitoring and as-built verification in augmented reality. Through its connection with the LIBAL common data environment, the BIM model is now also available to maintenance teams during hospital operation.

Cegelec Tertiaire IDF and the New Nantes University Hospital project
CEGELEC performs execution checks on its construction sites using NEXT-BIM by overlaying BIM models on site for faster and more accurate inspections.

NEXT-BIM and HRS Real Estate: A large-scale collaboration for the Campus Pictet de Rochemont project in Geneva
As part of the prestigious Campus Pictet de Rochemont project in Geneva, HRS Real Estate chose to integrate the advanced NEXT-BIM solution to optimize project management and execution.