Concrete impacts, measurable results

  • 50%

    reduction in rework costs. Clashes and design errors are detected earlier, before they become costly and impact the project schedule.

  • 50%

    gain in inter-team coordination. A shared BIM model visualized as an overlay on site eliminates misunderstandings and reduces back-and-forth between design office and site.

  • 90%

    gain in inspection time. Defects, deviations and missing elements are immediately visible on site. Example: Up to 1500 m² per hour for reservation inspections.

Discover our solution in video!

The video loads from YouTube when you click.

Benefits for your different teams

Houssein Abou Hamdan— VINCI Construction
With NEXT-BIM, the boundary between fiction and reality on construction sites is about to disappear. The use of NEXT-BIM on the TO LYON project allowed architects and contractors to share their data under real construction conditions and compare them with the initial designs and design changes. In addition to controlling execution quality during the EXE phase across all technical trades (HVAC, Plumbing, Architecture, Structure, Electrical), this helps verify the models.

Your 3 main priorities, our promise

Equipment adapted to your needs

Discover customer cases